Abandoned |
The project and/or bid has been canceled and is not expected to resume or rebid. |
Addendum |
Changes to drawings and spec books after they’ve been released for bidding. Single is Addendum; plural is Addenda. |
Additional Markup |
In Quick Bid, Additional Markups refer to costs that are not directly associated with Materials or Labor. Often called "Markups" in the construction industry, these can be things such as permits, site insurance, and bonds. |
AEC |
The Architecture, Engineering, and Construction (AEC) Industry. |
Alternate |
A portion of a bid that is separate from the base bid or an option to the base bid. It can be an "add alternate" or a "deduct alternate". It can then be decided whether or not to include the alternate in the final project. Example - Add alternate to include a balcony on the building. |
Annotation |
A markup on a drawing such as a textbox, clouding, a line or arrow, or highlighting that wouldn't affect the Quantity Survey. |
Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above. |
Something Wrong with this Article? Let us Know! |
The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.Copyright 2024 - All Rights Reserved. |
|