Quick Bid - 13.05 Setting up a Schedule of Values - QB

Views: 2385 Last Updated: 10/10/2024 02:43 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

To generate a (billing) Contract, click on the Schedule of Values Tab.



To maximize the space for working with your Contract, we recommend closing the Bid Navigator when using the Schedule of Values Tab.

Quick Bid Schedule of Values Tab - no contract

When you click on this Tab, if there is no existing Contract, the first thing you do is create one.

Click the New Contract button the add-new button is a blue plus sign and then fill in the information for the new contract.

Quick Bid Schedule of Values Tab - adding a new Contract

Name the Contract and select which Costs from the Base Bid, Accepted Alternates (if any), and Accepted Change Orders (if any) to include. Once a Bid or Child Bid is included in a Contract, it cannot be included in another Contract.

You will also choose to use Cost Code Type (Material, Labor, Equipment, etc.) or Cost Code Description for the Contract (examples below).

Quick Bid Schedule of Values Tab Shown by Cost Code Type
Shown by Cost Code Type

Quick Bid Schedule of Values Tab Shown by Cost Code Description
Shown by Cost Code Description

In the grid, you can to see a breakdown of the costs from the SOV Summary panel. From the details, you can change the Description of Work for each Cost Code (or Cost Code Description, if that's how you've chosen to setup your contract)

If you don't need to see Details for each Cost Code Type or Description, you can un-check Show Detail View .

Quick Bid Schedule of Values Tab - no details

When you select "Cost Code Type" your bid Costs are allocated to "Labor", "Material", "Equipment", "Other", "Subcontractor", "Tax" (all Labor Burdens, combined), and "AM" (Additional Markup), by default - you can adjust these in the Details section.

You can assign Description by Section, Area, or Size/Style by checking the appropriate option. We've selected "Areas" in the screenshot below.

Breaking Quick Bid Schedule of Values Tab Details by Bid Area

When you select Section, Area, or Size/Style, you can set the "Description of Work" even more granularly.

As you change the "Description of Work' in the details grid, your SOV Summary (upper grid) updates:

Quick Bid Schedule of Values Tab - allocating expenses

You change the Description of Work in the lower grid to affect how costs are "rolled up" in the upper grid.

In the upper grid, you modify the Overhead and Profit percentages, or you can plug in values. You can edit the values in any of the blue columns (Overhead %, Profit %, OHand P %, and % Contract) and the "Total Price" column. Changing one updates the others, as needed. As you modify percentages, you will notice that your "Variance" will change. The "Variance" is how far from the actual Total Bid Amount this contract is. Ideally, you want to get your Variance to "0", or very close, so your Contract (billing) matches your estimate.

Quick Bid Schedule of Values Values adjusted

When you are looking at the "Totals" row in the upper grid, keep in mind that the Adjusted Overhead %, Profit %, and OHand P% columns are not summations or averages of the information in the column These are calculated by dividing the Overhead, Profit, or O and H amount by the Job Cost Total.

When all your adjustments are complete, you are ready to generate your Contract. See the next article.

click here to view the previous article Adding a Company Logo to a Proposal Generating Contracts (from Schedule of Values) click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.