Quick Bid - 02.10 The Schedule of Values Tab - Creating Billing Contracts - QB

Views: 1105 Last Updated: 11/04/2024 01:56 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

The Schedule of Values Tab allows you to create billing contracts for the current Bid (Base Bid and Accepted Alternates/Change Orders).


When you click on the Schedule of Values Tab, the first thing you will do is create a New Contract (assuming you haven't already).

Click the New Contract button The add-new button is a blue plus sign and then fill in the information for the new contract.

Quick Bid Schedule of Values Tab showing New Contract dialog box

You will name the Contract, and select how to group the costs in your bid - by Cost Code Type ("Labor", "Material", "Equipment", "Other", "Subcontractor", along with Tax and Additional Markups) or by Cost Code Description (which breaks out all cost more granularly).

Next, you select which Costs to include (from Base Bid, Accepted Alternates, and Accepted Change Orders). A bid (either a Base Bid or Child Bid) can be added to only one Contract.

Using a base bid from the QB Sample Projects database, we set the Description of Work to "Cost Code Type" (shown in screenshot above).

Click OK to save the Contract, now you can start adjusting your contract costs.

QB Schedule of Values Contract

See Related Articles for details on generating Contracts.

Well, that's your introduction to the Quick Bid program - how it looks. The rest of this User Guide will help you create and price bids, generate reports and proposals, and help you get the most out of your software. Before you jump into bidding, you need to do some setup work in Quick Bid to tell the program how you estimate and the defaults you want to use when creating/pricing bids.

click here to view the previous article The Payroll Tab Context Menu Copying Rows of Data from the Program Tabs click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.