07 Creating and Editing Conditions, Bid Areas, Typical Areas, and Phases
1 |
QB - 07.00 What Are Conditions?
The first step after creating a Bid is to create Conditions. A Condition is… |
2 |
QB - 07.01 How to Create or Add Conditions to a Bid
A Condition is a description of an object such as a wall, ceiling, or a door,… |
3 |
QB - 07.01.01 Copying Conditions to a Different Bid or a Child Bid
It's often easier and more efficient to use something that is already in the… |
4 |
QB - 07.01.02 Duplicating Conditions within the Same Bid
Sometimes, an existing Condition is similar enough to what you need that simply… |
5 |
QB - 07.02 Create Conditions from an Excel File (importing a Quantity Survey)
Quick Bid supports importing a properly formatted spreadsheet to create Condition… |
6 |
QB - 07.02.01 How to Format a Quantity Survey Excel Spreadsheet so You can Import It into Quick Bid
Quick Bid supports importing a properly formatted spreadsheet to create Condition… |
7 |
QB - 07.02.02 Importing your Quantity Survey Excel File to Create Conditions
Quick Bid supports importing a properly formatted spreadsheet to create Condition… |
8 |
QB - 07.02.03 Imported Quantity Survey Condition Names, Notes, Types, and Quantities
Quick Bid supports importing a properly formatted spreadsheet to create Condition… |
9 |
QB - 07.03 Adding Material and Labor to a Condition Using the Condition Detail (Building or Pricing Conditions)
The Condition Detail dialog box is probably the single most important screen… |
10 |
QB - 07.03.01 Condition Detail: Condition Information
Condition Information describes the physical attributes of a Condition - what… |
11 |
QB - 07.04 Condition Detail: Bid Areas, Typical Areas, and Phases Overview
Bid Areas Bid Areas are defined locations within a single project such as buildings,… |
12 |
QB - 07.04.01 Condition Detail - Setting Up Bid Areas
Warning It is important that when you are creating your Bid Areas, if you delete… |
13 |
QB - 07.04.02 Condition Detail - Assigning Condition Quantity to a Single Area
To allocate the entire Condition's Quantities to a single Bid Area, on the… |
14 |
QB - 07.04.03 Condition Detail - Assigning Condition Quantities to Multiple Areas
To allocate the Condition Quantity's to more than one Area, Click the Multi-Area… |
15 |
QB - 07.04.04 Condition Detail - Setting Up and Using Typical Areas
Note If you are using Quick Bid and On-Screen Takeoff interactively, you must… |
16 |
QB - 07.04.05 Condition Detail - Setting Up and Using Phases
Phases allow you to roll-up Bid Areas (two articles back) when exporting to… |
17 |
QB - 07.05 Condition Detail - Section Totals and Unit Costs
The Section Totals Area contains information about the Condition: Pricing information… |
18 |
QB - 07.06 Condition Detail - Item Detail Grid
Possibly the most important part of creating a Condition is defining what it… |
19 |
QB - 07.07 Condition Detail - Notes
Condition Notes are a convenient way to communicate important information about… |
20 |
QB - 07.08 Condition Detail - Controls Toolbar
The Condition Detail Controls, the buttons at the bottom of the Condition Detail… |
|
|
|
Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above. |
Something Wrong with this Article? Let us Know! |
The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.Copyright 2024 - All Rights Reserved. |
|