DPC - 03.02.05 Project Manager - Set DPC Bid Options

Views: 871 Last Updated: 11/04/2022 12:12 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

While the Cover Sheet is still open and before sending this Bid to the field, there are three options that you must set.

  • Hours/Day (affects how the Timecard Tab works)
  • Start Week on (determines the first day of the week on the Timecard Tab)
  • Ignore Bid Areas on Timecard Entries (this is not recommended - if the project uses Bid Areas for takeoffs, time must be assigned to the correct Bid Area or the Budget Tab cannot calculate projections for individual Bid Areas. If you choose to "Ignore Bid Areas..." you will not be able to "Break on Areas" when viewing the Budget Tab.

These settings default to the New Bid settings under Tools > Options but may be changed at the project level before a bid is set to the field.

DPC Cover Sheet DPC options

Warning
Once this Bid is sent to the field as a DPC Bid Package, or there is any "percenting" done on any Plan, or any time applied to any Timecard, the 3 entries on the right cannot be changed, even if the Bid is unlocked.

Project Manager - Assign Roles Review Budget Tab Prior to Sending Bid to Field