On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

OST - 05.09 Duplicating Conditions

Views: 593 Last Updated: 11/03/2022 02:11 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

Sometimes, an existing Condition is similar enough to what you need that simply creating a copy of it and making minor changes is best. For example, if you are taking off several floors of a building and some are 8', 9', and 10' to deck, create the 8' Condition first, then duplicate it twice and simply change the Height in the 2nd and 3rd Conditions.

Note
Another shortcut - once you have all your Conditions created/built, save them as Styles and Styles Sets to make using them in the future a literal two-click process. See Related Articles for details on Styles and Style Sets.

To Duplicate an existing Condition:

  • Select the Condition (or Conditions) from the Condition List
  • Click the Duplicate icon ALT TEXT, right-click and select Duplicate, or press <Ctrl> <D> on the keyboard
  • The Condition is duplicated and immediately shows in the Conditions window - the duplicate has the same properties as the original Condition except for Cond. No. and Color
  • Double-click the new Condition to open the Condition Properties dialog box - and make whatever changes are necessary to distinguish it from the original Condition
  • Click OK

The Duplicate copy will be selected and the Name will be in "edit" mode so you can quickly rename it. When you duplicate multiple Conditions at the same time, the first duplicate copy will be in selected and the name in "edit" mode.

Note

You can duplicate more than one Condition at a time. Hold down the Shift (adjacent) or CTRL (not-adjacent) buttons to select the Conditions you want to duplicate, then click the Duplicate button.

You can duplicate a Condition and reassign all the takeoff associated with it on the current page to the copy. This is a huge time-saver if you realize you took off a room full of walls with an 8' Condition (or copied a room full of takeoff...) and really need it associated with a new, 10' Wall. See Related articles for more information.

If you're working with a bid connected interactively to Quick Bid, when you duplicate a Condition in OST, the Condition is duplicated in Quick Bid including all its pricing (Items).

click here to view the previous article Copying and Pasting Conditions Deleting Conditions click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.