On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

On-Screen Takeoff - 05.04.01 Accounting for Slope in a Linear Condition - OST

Views: 957 Last Updated: 11/08/2024 11:38 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

Linear Conditions can be setup to accommodate slope.

Linear Slope Explained

On-Screen Takeoff does not use conversion ratios to calculate sloped linear objects, all calculations use standard mathematical equations. The quantity results in On-Screen Takeoff do not account for waste, overages, coverage, or any other industry-specific calculations, they provide the exact measurements of the sloped linear object (adjustments to those quantities can be made in your Estimating product).

Example

Set the Scale of your Page to 1"=1', just to make things easier to follow

Set up a Linear Condition with a slope of 4:12 (for every 12 feet of run, rise is four feet)

On-Screen Takeoff Linear Condition Properties set up for slope

Takeoff a line on an orthographic projection that is 12' long (birds eye view)

Condition Result versus visual view of sloped takeoff

The Linear result is 12.649 LF - this is correct because On-Screen Takeoff calculates true math, not slope-factor (industry set conversion factors that may not be based on direct mathematics).

What you're drawing is the "birds' eye view" of the linear - the horizontal line that represents it on the plans.

The Math

Review the right triangle formed by the 12' linear we drew above.

On-Screen Takeoff uses a right triangle to calculate the hypotenuse

In the hip roof diagram below, the line "A-B" (the base of the triangle) is what is actually taken off (drawn by the estimator) on the plan.

graphic that shows the right triangle created by drawing a sloped linear takeoff object

No conversion factors are needed because calculating the line "A-C" is a mathematical equation.

Note
For a Geometry refresher on how to calculate the hypotenuse of a right triangle, see: http://www.mathwarehouse.com/geometry/triangles/right-triangle.php

On-Screen Takeoff v. Conversion Factors

On Screen calculates the exact distance between points A and C, (the ridge or hip of the roof) in the screen shot above. In the example above, the conversion factor calculated for this measurement for a 4:12 slope is 1.05409 although the roofing industry lists the conversion factor as 1.453.

Compare that to the measurement "A" below. The conversion factor (1.453) is required to convert that measurement to the angled (45°) and sloped line. But in OST, you've already accounted for the angle because you drew the takeoff on an angle so the 'conversion factor' would, of course, be lower.

how On-Screen Takeoff's slope calculations compare to industry conversion charts/ratios

In example "A", the conversion factor was necessary (prior to On-Screen Takeoff) because the estimator may not have known the exact distance of "B" so they had to calculate the diagonal line using the known linear "A".

In example "B", the line 'B' is the same as line "B" in the first example, the estimator can just takeoff that line rather than having to apply a conversion factor to line "A" to calculate line "B".

On-Screen Takeoff saves the estimator a step - there is no need to calculate the horizontal line of the hip angle because it is taken off directly on the plans. The program automatically calculates the measurement of the sloped framing member without the need for any conversion factors.

Note
Reminder: On-Screen Takeoff's calculations do not take into account waste or overhang - the linear total is based on the right triangle created by the line you draw (the base of the triangle) and the height which is based on the rise:run setting. The program calculates the hypotenuse of that right triangle (A2 + B2 = C2).

click here to view the previous article Creating Linear Conditions Creating Area Conditions click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.