On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Quick Bid - 10.06 Swapping Labor Cost Codes on the Labor Tab - QB

Views: 560 Last Updated: 10/21/2024 09:57 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

The Labor Tab displays a list of every Labor Cost Code used in the current Bid, summarized by production rate and unit of measure (UOM).

A (Labor) Cost Code identifies a particular type of labor being performed. These codes are broken out by UOM and production. So, the same cost code may be listed multiple times on the Labor Tab, depending on the UOM and production rate for each Condition where it is used. You can also configure the Labor Tab to break each LCC 'by Height' to verify production for different heights meets your requirements.

the Quick Bid Labor Tab shows you all the Labor Cost Codes used in a bid

Changing/Swapping Labor Cost Codes

You may find that the incorrect Labor Cost Code was used and needs to be 'swapped' with another. You can do this right on the Labor Tab.

Click the Lookup the Lookup button is a magnifying glass that opens a related Master list tool for the Cost Code you want to replace - the Cost Code list (Master) dialog opens.

Select the new Cost Code to use and click Select, the dialog closes and the Cost Code is changed in every Condition where it was used. Production and Labor costs remain the same, only the LCC is swapped out.

If the Labor Tab is filtered by a Section, then the LCC is changed, only Condition line items where the LCC is associated with the selected Section are updated.

If the Labor Tab is filtered by Area, however, the entire Condition is updated, not just the filtered value because each line item in the Grid can be associated with a single Section and LCC. If you need to split up an Items quantity into different Sections or LCCs, simply add the Item to the Condition Detail Item Grid again, and make adjustments to Quantity, Section, and any other field necessary.

See Related Articles for more information on setting up Cost and Account Codes (and other Master tables) to organize job expenses.

click here to view the previous article Adjusting Labor Production at the Bid Level Refreshing a Bid's Payroll Labor Wages from Master Data click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.