Quick Bid - 09.02 Material Swapping (Replacing a Material throughout your Bid) - QB

Views: 947 Last Updated: 10/22/2024 02:40 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

If you are like many estimators, you complete a Bid and then someone comes along and says they want a "simple change". For example, let us say you are a drywall contractor and you've finished your Bid. Originally, the client specified normal 5/8 inch drywall so you used the appropriate Material when building your Conditions. Once you've completed the Bid, however, you determine that although you priced 5/8" wallboard, you really needed 5/8" moisture-resistant wallboard, or the client comes back and says, "Can you change that to...".

Quick Bid makes it very easy to swap-out a Material for a similar Material, anywhere it is used in the Bid.

First, open the Material Tab.

In our example, we are going to work with "X58" (5/8" drywall board) and swap it out with "X58MR" (moisture resistant drywall board).

Locate the Material you want to swap out. In this case, you will notice we have four entries for X58 because there are four distinct sizes (4'x 8', 4'x 9', 4'x 10', and 4'x 12').

We will select the 4'x 9' size to start - if we click "View conditions in use" we can see in the Condition's Item Detail Grid where this Material/Size is used.

Quick Bid Materials Tab showing X58 Material in size 4 ft by 9 ft

Right-click on the Material/Size you want to replace and select "Replace Material where in use"

Note
If a selected Item is included in an eQuote, the option to Swap Materials is disabled.

Quick Bid Materials Tab context menu highlighting Replace Material where used option

The program displays a dialog box explaining the Material Swap matching rules:

Quick Bid Material Swapping information dialog box can be suppressed if you don't want to see it

Items to be swapped must match the following criteria:

  • In the Item Detail, on the General tab, the Items must use the same Item Setup and UOM
  • In the Item Detail, on the Calculation tab, the Items must use the same Condition Quantity for calculation (if the calculation method doesn't match, that's OK, the Item Detail Quantity will be set to "Manual" entry but the original Item Detail Quantity will be the same)
  • In the Item Detail, on the Sizing tab, the Size Method must match
  • In the Item Detail, on the Material Pricing tab, the Material Pricing Method must match
  • In the Item Detail, on the Labor Pricing, the Labor Pricing Method must match

When you click Continue, you are presented with a Master Items list, filtered to Materials that are compatible replacements for the Material you are swapping out (Setup, UOM, Calculation, Sizing, etc.).

Note
You can remove this filter by unchecking "Show matching items" but you cannot select any Item that doesn't match the criteria indicated above.

The Quick Bid Replace Item dialog box may show you Materials that don't make sense, but you should find the one you need

Highlight the Material you want to 'swap in' and click the Select button.

Caution
You will be given no further confirmation that the Material Swap will occur. Once you click Select, Quick Bid performs the Material Swap. If in doubt, click Cancel.

In our example, we selected X58MR and allowed Quick Bid to change the Material for the "4' x 9'" size only...

Quick Bid Materials Tab showing that X58 has been replaced with X58MR for size 4ft by 9ft

Additional Considerations

  • Section, Labor Code, Item Detail Quantity, and Labor Production rates are not changed when Material Swap is used. We assume you set these the way you like and simply want to swap out one Material for another. You can go back and review each Condition to verify you are satisfied with the result.
  • If the Item you are swapping a Material with does not have a matching size already, you will be asked if you want to add it:
    Material Swap can add a missing size to the selected replacement Item if it doesn't exist
    This does not add the size to the Master Item, only to the Bid-level Item.
    • If you choose "No", the Material Swap is canceled.

Seeing as we are on the topic of Materials and Labor, what happens if you are working on an older Bid and you know Material and Labor pricing has changed. You could edit the pricing on the Materials and Labor Tabs, however, if you simply want to update your Bid to match the database's current pricing, we make that easy, see the next article...

click here to view the previous article Making Adjustments to Materials Used, Suppliers, and Material Costs Refreshing a Bid's Pricing and Wages from Master Data click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.