On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Digital Production Control Quick Start Guide - 06.04 Non-Estimated Cost Codes - DPC

Views: 764 Last Updated: 07/30/2024 10:45 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

You can add a new, non-estimated Cost Code to your project anytime to account for unexpected labor or job site labor not associated with Takeoff.

checkbox Click the Add New Cost Code button Add New Cost Code button

checkbox Select from the Cost Code List. The non-estimated cost code will be added to the list under all the normal, estimated Cost Codes.

DPC Timecard Tab - time entry grid showing non-estimated Labor Cost Codes

Indirect Expenses

If your project includes "Indirect Expenses" (from Quick Bid), these are automatically percented based on labor (hours) allocated against the related Labor Cost Code. See Related articles for more information.

click here to view the previous article DPC - Quick Start Guide - 06.03 Timecard Entry DPC - Quick Start Guide - 06.05 Timecard Options click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.