DPC - Quick Start Guide - 06.04 Non-Estimated Cost Codes

Views: 708 Last Updated: 10/21/2021 02:50 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

You can add a new, non-estimated Cost Code to your project anytime to account for unexpected labor or job site labor not associated with Takeoff.

checkbox Click the Add New Cost Code button

checkbox Select from the Cost Code List. The non-estimated cost code will be added to the list under all the normal, estimated Cost Codes.

DPC Timecard Tab - time entry grid showing non-estimated Labor Cost Codes

Indirect Expenses

If your project includes "Indirect Expenses" (from Quick Bid), these are automatically percented based on labor (hours) allocated against the related Labor Cost Code.  See Related articles for more information.

previous article arrow DPC - Quick Start Guide - 06.03 Timecard Entry DPC - Quick Start Guide - 06.05 Timecard Options next article arrow



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! Copyright 2023 - On Center Software, Inc. by ConstructConnect - All Rights Reserved.