DPC - 05.02.01 Percenting Step 1 - Choose the Floor

Views: 807 Last Updated: 11/04/2022 12:14 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

To start percenting, the first thing you do is choose the floor (Page) that reflects where the work (labor) was performed.

 

Choose the Floor

Click on the Image Tab

Click the Page drop-down

Select the floor based on the page name (this is why it is helpful if the Project Manager collates drawings before sending out the Project).

DPC Image Tab - select floor

The Basics of "Percenting" Percenting Step 2 - Choose the Labor Cost Code(s)