On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Digital Production Control - 05.02.01 Percenting Step 1 - Choose the Floor - DPC

Views: 640 Last Updated: 08/09/2024 11:54 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

To start percenting, the first thing you do is choose the floor (Page) that reflects where the work (labor) was performed.

Choose the Floor

Click on the Image Tab

Click the Page drop-down

Select the floor based on the page name (this is why it is helpful if the Project Manager collates drawings before sending out the Project).

on the Image Tab, using the Page Navigator, select the plan that indicates the floor on which work was performed

click here to view the previous article The Basics of "Percenting" Percenting Step 2 - Choose the Labor Cost Code(s) click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.