One final warning - sending out a new DPC Package will overwrite the Foreman’s existing bid with the
Project Manager’s changes. Any pending changes the Foreman (or foremen) did not send to the
Project Manager will be lost - there is no way for the Foreman to send those changes to
Project Manager once the
Project Manager creates a new DPC Package. It is critical that all DPC Changes are sent to the
Project Manager and incorporated into the
Project Manager's
database before the Project Manager sends a new *.dpm file to the field.
Be sure to coordinate between the
Project Manager and each Foreman before sending/receiving new Bid Packages for existing projects.