On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Digital Production Control - 04.06.02 Returning Bid and New Change Orders to DPC Mode

Views: 269 Last Updated: 08/08/2024 08:06 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!
Warning
Failure to follow the instructions below will cause your DPC project to fail to retrieve information from Quick Bid correctly. These steps must be followed as documented, if you have any questions, contact Support.

After the Project Manager has received all DPC Change Files from the field and imported them and has made all the necessary changes to the base bid and any Change Orders, starting with the most recently added Change Order, the Project Manager clicks the DPC button The DPC Button flips a bid or change order into DPC mode to convert the job back to DPC mode, then returns to the Bids Tab, selects the next newest Change Order, flips it to DPC Mode, repeating until he or she works his or her way up to the Base bid, which is the last to get flipped back to DPC Mode.

Change Orders that were previously set to "DPC Mode" but have not been "Unlocked" or changed do not have to go through this process again, skip them. Only new or modified Change Orders must be 're-flipped' to DPC Mode, one-at-a-time.

Warning

You must open the Image Tab in each newly added Change Order one-at-a-time, click the DPC Button, then return to the Bids Tab and select any other Change Order added after the original Bid Package was sent to the field and repeat this process before setting the Base Bid back to DPC Mode. DPC only requests updates from Quick Bid for a Change Order when the DPC Button is clicked within that Change Order.

Do not use the Bid View drop-down to switch between Change Orders or the Base Bid, return to the Bids Tab.

The Base Bid is the last bid in the project that should be set to DPC Mode, after all child bids.

Do not use the Bid View drop-down to switch between change orders or the base bid

Warning
As mentioned in previous articles, the Project Manager must receive all work from the field (foremen) before creating a new DPC Package. The new DPC Package replaces the Bid on the foreman's machine - any un-sent work will be lost.

click here to view the previous article Unlocking a Bid Sending Updated Bid to Field click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.