On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Digital Production Control - 03.02 Project Manager - Prepare Bid for DPC

Views: 792 Last Updated: 08/07/2024 08:17 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

There are several steps necessary to correctly prepare a job for use with Digital Production Control.

Get Your Bid Ready

These are the steps the Project Manager completes to get the bid ready for DPC. Each step is detailed in the articles that follow.

  • First, copy your On-Screen Takeoff and Quick Bid bids to their own "DPC" databases (this isolates them and prevents another user from inadvertently modifying a Bid already in the DPC process). *** if you are using SQL, copy these bids to a local Access-type database, accessible only from your machine. (Yes, this means creating new, separate OST and QB databases for EACH project you are putting into DPC mode.) Be sure to reconnect the bids so they are in "Interactive Mode", see Related Articles for details.
  • Verify all takeoff is properly assigned to Bid Areas (check the Takeoff Tab for any takeoff in 'unassigned')
  • Verify that you (or the Estimator) has not used Typical Areas in the project.
  • Create the Archive and Budget copies of your project, (see next article) - be sure the archive copy is set to a "locked" Job Status
  • Collate the drawings
  • Activate DPC Mode
  • Assign Project Manager and Foremen
  • Set DPC Options on Cover Sheet for this specific project
  • Send project file to Foreman
Caution

For the rest of this User Guide, the "BUDGET" copy of the bid is used.

Do not use the "ARCHIVE" copy for DPC. That copy of your Bid should be considered a backup copy for reference only.

Copy the OST and QB bids to their own databases

  • Follow the instructions in the OST and QB User Guides to create new databases, strictly for use with DPC (see Related Articles).
  • Then, copy both the OST and the QB Bids into these databases to isolate them from your 'working' database (this is especially important if your 'working' database is a shared, SQL database - you do not want someone not involved with the DPC process to access your DPC Bids).
  • Once the Bids are in their own DPC databases, reconnect them (see Related Articles).

Verify Takeoff is done correctly

  • Open Cover Sheet of the "Budget" project
  • Click the Areas button
  • Review Bid Areas and/or create as needed (this should have been done during the takeoff/estimating process).
  • Ensure that all takeoff is assigned to appropriate Bid Areas - see the On-Screen Takeoff User Guide for instructions on creating/using Bid Areas. Double-check the Takeoff Tab to ensure there is no takeoff left in "unassigned". If there is any takeoff in "unassigned" go back to the Pages where that 'unassigned' takeoff exists and assign it to a Bid Area before flipping job to DPC Mode.
  • Verify that you have used Typical Groups and Repeating Pages, not Typical Areas. DPC is not compatible with Typical Areas as there is no actual takeoff associated with the extended Condition quantities.

click here to view the previous article The Basics of Using DPC Project Manager - Archive Original Bid click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.