On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Digital Production Control - 01.06.06 The Notes Tab - DPC

Views: 542 Last Updated: 08/05/2024 12:57 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

The Notes Tab provides a place where important notes regarding a project can be added. These notes can include explanations about daily discrepancies (weather, labor shortage/illness, material delay, etc.) or to annotate if a daily entry was missed.

The Digital Production Control Notes Tab is a permanent record of project events the Foreman wants to communicate to the Project Manager

Notes are included in the DPC Changes file when changes are sent to the Project Manager.

Notes are time stamped when created, this time stamp remains constant, even if the note is later modified.

click here to view the previous article The Payroll Recap Tab The Project Express Tab click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.