When exporting a Bid that contains eQuotes via a Bid Package, previously created eQuotes are included however, after you import that Bid Package into the same or a different
database, you must resend any eQuote requests to vendors. Any outstanding eQuote requests/replies are linked to the database/bid from which they were sent.
An Item can be added to only one eQuote within a Base Bid (including Alternates) but can be added to different eQuotes within a Bid and multiple Change Orders (because Change Orders hold their own Material Pricing, where
Alternate share Material Pricing with the Base Bid).