On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Quick Bid - 07.09 Condition Detail - Item Grid Context (right-click) Menus - QB

Views: 550 Last Updated: 10/29/2024 06:25 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

There are several options available in the Item Grid via the Context Menu. Just right-click (or alt-click, if you are left-handed) within the Grid to see the choices available (they vary depending on where the right-click occurs).

Not all options shown in the graphic below show up on the context menu - only options relevant to the place where the right-click occurs are displayed/available.

There are many options only available by right-clicking in the Item Grid

Option Description/What it does/How it is used...
View Section List Opens the Master Divisions/Sections list so you can change the Section for a line item.
View Item List Opens the Master Items list so you can choose an Item to insert or change a line item to another Item.
View as Qty/Day (or Qty/Hr) Toggles between Quantity per day/hour.
View as Pcs/Day (or Pcs/Hr) or Cuts/Day (or Cuts/Hr) When "View as Material Size" is active, toggles between Piece per day/hour.
When "View as Cut Size" is active, toggles between Cuts per day/hour.
View as Cut Size or View as Material Size When the height of a line item is less than the size of the material, you can select "Cut Size" to see production based on the number of cuts required.
View as Crew/Days (or Crew/Hrs) Toggles between Crew days/hours.
New Inserts a new, blank item row in the grid.
Delete Deletes the currently selected row(s), cannot be undone.
Cut, Copy, Paste Cuts, copies, or pastes the selected rows.
Show Decimal Places Allows you to set the number of decimal places shown for columns that show quantities (OC, Layers, Qty, Mat. Price, Lab. Cost, Qty/day, Pcs or Cuts/day, Crew Hrs, and Material, Labor, and Item Totals.

click here to view the previous article Condition Detail - Controls Toolbar Condition Assemblies (Saving and Using Condition Item Templates) click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.