On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Quick Bid - 05.10.01 The Item Detail Labor Cost Tab: General Information - QB

Views: 503 Last Updated: 10/31/2024 12:33 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

The first thing you'll need to do when setting up your Labor Cost tab is to select the Labor Cost Method and a Default Wage Type.

General Labor Information

Item Detail Labor Pricing Tab highlighting general information section

Labor Cost Method

This field determines how labor costs are applied. The four options are:

Pricing MethodDescription/How it is used...
UOMUse this option to setup production per day, hour, and labor cost by the UOM (square, each, etc.) as set for the Item record in the upper right corner of the Item Detail.
StyleUse this option to setup production per day, hour, and labor cost for each different Style.
PieceUse this option to setup production per day, hour, and labor cost for each different Size.
ContainerUse this option to setup production per day, hour, and labor cost for each different Container.

The "Sizing" options available depend on the UOM of the Item and the configuration of the Sizing and Material Cost tabs (see Related Articles).

UOM, Style, Piece (Size), or Container?

If an Item is sized (on the Sizing tab) as a Style or a Multi-Sized, you can choose to price each Style's Labor separately, or use a single price for Labor, regardless of Size/Style.

If the labor required to install a single unit is the same regardless of the Size or Style, select either "Piece" or "UOM" rather than "Style" or "Size" as the Pricing Method on the Labor Pricing tab.

Note
The variables found at the Sizing tab, the Labor Cost tab, and the UOM choice provide a vast range of methods for pricing labor. When building a new Item or simply modifying an existing Labor record, test it before using it in a real job. Better yet, use an existing Item that's similar what you need and 'duplicate' it.

Default Wage Type

Choose a default Wage Type for the Pay Class. Anything other than "Default" overrides the Wage Type set on the Cover Sheet of a Bid when the Item is added to a Bid.

The Wage Type can be changed at the Condition level or Bid Level after pricing the Bid; setting the Default Wage Type in the Master Item Detail only sets the default for when an Item is used.

We recommend leaving it as "Default" so Items will use the Bid's prevailing Wage Type.

Next, you configure Who is performing the labor (the Installer).

click here to view the previous article Item Detail - Labor Cost Tab Overview and VideoLabor Cost Tab - Specifying Installer (Crew) click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.