On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

QB - 05.10 The Item Detail Labor Cost Tab: Overview and Video

Views: 1373 Last Updated: 11/07/2022 01:43 pm 100 Rating/ 1 Voters
Be sure to rate this article 5 Stars if you find it helpful!
Note
Versions 4.97 and earlier called this the Labor "Pricing" tab.

The Labor Cost tab is used to define how Quick Bid calculates Labor for an Item.

The Labor Pricing tab displays two grids: installer information and production rates. The drop down “Labor Pricing method” controls how the labor costs is applied (UOM, Style, Piece, or Container) which is dependent on how you configure the Sizing tab.

These settings establish the total direct cost of the crew which excludes Burdens (additional payroll costs such as tax and union dues), Markups (overhead/profit), and Indirect Expenses (costs associated with stocking, cleaning, supervision, and per diem). See Related articles for more information Payroll Settings.

So, let's dive in and start with the general information regarding Labor Pricing.

previous article arrow Material Cost Tab - Price by Container Labor Cost Tab - General Information next article arrow



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! Copyright 2023 - On Center Software, Inc. by ConstructConnect - All Rights Reserved.