On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Quick Bid - 03.04 Program Options - M/U Cost Codes (Associating Cost Codes to Various Markups for Exporting and Reporting Purposes) - QB

Views: 734 Last Updated: 11/04/2024 12:01 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

The M/U (Markup) Cost Codes tab allows you to specify unique Cost Codes to the markup on Material, Labor, Equipment, and Other Markup charges. These codes are used to control the layout of information shown on Bid Reports and Bid Exports.

If these fields are left blank, the Markup values are simply assigned to the Cost Codes from which they are generated.

Caution

Some Accounting Exports include an option called "Include and Distribute Material Tax" . When this option is checked, the Material Tax is rolled into the Material Cost Code from which it is derived, however, when unchecked, Material Tax is not included in the Export at all, even if you assign Material Tax to a Cost Code.

Job Budget Export - ComputerEase Include and Distribute Material Tax?

Other Accounting Exports include an option called "Distribute Tax". When this option is checked, Material Tax is rolled into the Material Cost Code from which it is derived when this option is selected. However, when unchecked Material Tax shows as a separate line up, with the same Material Cost Code, but with a different Category Code (MT).

Job Budget Export -Dexter-Chaney Include and Distribute Material Tax?

See Related Articles at the bottom of this article for additional information about the various exports available in Quick Bid.

Quick Bid Options dialog box with MU Cost Codes tab selected

To enter a Cost Code, click on the field and type it in or click the Lookup tool the lookup button is a magnifying glass that opens the Master Cost Code list to select from a list. See Chapter 3 for more information on Cost Codes and Account Codes.

click here to view the previous article Program Options - New Bid Program Options - Lookups click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.