On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Quick Bid - 02.04 The Equipment Tab - QB

Views: 938 Last Updated: 11/04/2024 01:45 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

The Equip Tab displays a summary for each piece of equipment or equipment assembly used in the current Bid.


Quick Bid Equipment Tab

Each column can be sorted by clicking once on a column header, then again to toggle between ascending (arrow up) and descending (arrow down).

Add a New Equipment Row

  • Click the New Button the multi-function button looks like a piece of paper with a dollar sign on it; or
  • Right-click anywhere within the Equip Tab window and select New Equip Entry from the menu; or
  • Press <Insert>; or
  • Click File > New > Equipment from the Main menu,

A blank line is added to the Equip Tab.

Enter a Description of the equipment in the Equipment field or right-click anywhere in the Equip Tab window and select Insert Equipment Assembly from the menu.

Enter a Section or click the Lookup button the lookup button is a magnifying glass that opens the Master Divisions and Section List to select from the Master Divisions/Sections list.

Enter a Qty (quantity).

Enter a Unit or click the Lookup button the lookup button is a magnifying glass that opens the Master Containers List to select from the Master Container list.

Click the Lookup button the lookup button is a magnifying glass that opens the Bid Areas dialog box to select an Area to which the Equip amount is assigned or check the Multi box to allocate the expense across multiple areas. When you check the Multi box, the Equip Multi-Area dialog opens - enter the dollar amount to assigned to each area.

On the Equipment Tab, you can assign an equipment cost to multiple bid areas

Enter the Equip Rate (the Equip Total field calculates by multiplying the Qty. and Equip Rate fields).

Enter an Equipment Cost Code or click the Lookup button ALT TEXT to select from the Master Cost Code list.

Enter the Lab. Rate (the Lab. Total (Labor Total) field calculates by multiplying the Qty and Lab. Rate fields).

Enter a Lab. Cost Code or click the Lookup button the lookup button is a magnifying glass that opens the Master Cost Codes List filtered to labor codes to select from the Master Cost Code list.

Enter a Payroll Class or click the Lookup button the lookup button is a magnifying glass that opens the  Master Payroll Classes list to select from the Master Payroll Class list.

Enter a Wage Type or click the arrow to select from a drop-down list of all Wage Types in the current database.

click here to view the previous article The Subs Tab Context Menu The Equipment Tab Context Menu click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.