On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Digital Productiong Control License Comparison - DPC

Views: 451 Last Updated: 07/30/2024 10:54 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

Digital Production Controlâ„¢ has two main license types, Project Manager and Foreman. A company must have at least one PM version to use Digital Production Control - they could use many foreman versions for field entry.

The Foreman license provides field workers a slightly less feature-rich product with just the functionality that a typical field employee might need.

The PM license provides the Estimator/Project Manager all the functionality a Foreman has, plus various management-level features. The PM license is required to convert an On-Screen Takeoff file and Quick Bid estimate into a Digital Production Control project.

Feature Comparison

Project Manager License (meant to be the main install of Digital Production Control)

  • Can convert bid to Digital Production Control job (necessary step to use Digital Production Control)
  • Can Send Digital Production Control package files to other users
  • Can convert the Digital Production Control project back to takeoff mode to add change orders or make other changes
  • Can Approve timecards
  • Can assign Project Managers and Foremen on the Cover Sheet

Foreman License (meant to be a satellite install of Digital Production Control)

  • Can percent work, enter timecards, and enter notes
  • Can receive Digital Production Control jobs from a Project Manager (cannot create Digital Production Control jobs)
  • Can send Digital Production Control change files (percenting information and timecards) to the PM
  • Cannot change the original bid or takeoff but can return to Takeoff mode to view takeoff
  • Can draw Annotations that are included in the change file returned to PM
  • Cannot Approve timecards
  • Cannot assign Project Managers or Foremen to the Cover Sheet



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.