On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Quick Bid 4.91.1.24 Release Notes (10/12/2010) - QB

Views: 739 Last Updated: 08/15/2024 02:32 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

Replaces Quick Bid 4.91.0.52 released on 7/1/2010.

Fixes

  • Bids are locked when DPC Mode is active
  • The "Import Quantity Survey" template for Quick Bid Conditions no longer predefines the column row header location
  • The "Export Format" file type matches the displayed file format in the Open File Type Dialog for Accounting and Material Exports
  • Maxwell System - American Contractor Job Budget File Exports include Subs
  • Timberline Job Budget Export now includes values and area assignments for Subs
  • Timberline Budget Exports separates Subs into correct areas
  • Sorting the 'Size' column in the Open Database dialog correctly displays in the direction of the ascending/descending arrow
  • Other Totals are displayed on Cost per Sq. Size, Labor Risk, and Payroll Reports
  • When filtering the Labor Tab by Area the unassigned Labor codes display correctly
  • The labor Tab displays all the codes used in the bid When filtering the Labor Tab by Cost Code after using the Area filter
  • Resetting Default Options resets Labor Tab view back to program default
  • Changing a condition quantity result type in On-Screen Takeoff updates the Quick Bid Condition Unit Cost on the Condition tab
  • Section Indirect Expenses are retained when Others or Equipment data use the same section
  • Bid Date displayed on Change Order Bid Summary Report
  • When a filter is set on the Material Tab and/or Labor Tab, the list is refreshed when deleting the last condition from the list
  • Grouping by Divisions and Sections displays correctly on Bids tab
  • Breaking by height updates Labor Tab view
  • Multiple Subcontractor bids are exported to Budget Exports
  • The 'Distribute Tax' checkbox remains persistent when using the Foundation Job Budget Accounting Export
  • Dexter + Chaney Job Budget Accounting Export has been changed to a "CSV" file format
  • QB crashes when user tries to import an eQuote file that does not have the matching bid in the database



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.