|
|
On-Screen Takeoff 3.94.0.15 Release Notes (11/17/2016)
Views: 687 Last Updated: 07/09/2024 02:29 pm |
0 Rating/ 2 Voters
|
|
Be sure to rate this article 5 Stars if you find it helpful! |
On-Screen Takeoff
Features
- Allow user to change Job Status from Bids Tab (via context menu)
- Display Estimator column on the Bids Tab
- Add Job No. and Job Status filters to Bids Tab
- Add Overlay control toolbar to Image Tab
Changes
- Automatically size the Auto Count results dialog box to show up to results without scrolling (dialog box can be resized by user now also)
- Replace Darken and Enhance buttons on the Image toolbar with an Adjust Images button that allows more options and changes can be applied to all pages
- Add ability to apply custom scale to all pages, default Set Scale dialog box to 'custom'
- Add Reassign Takeoff button to Conditions list so it is easier to find
- Restructure Help and Training options to make them easier to locate
- Move Request Feature, Request Support, and How Do I... buttons to Help menu
- Replace locally-installed, static help file with links to Online User Guide
Fixes
Reference/Case # - Description
- 254413 - Shape annotations do not print at set line width
- 247090 - Copy Selection causes an error
- 143125 - Negative counts inside a Typical Group cause incorrect Typical Group Markers to be selected
- 25839 - Importing a Bid Package from Project Express causes all folders to expand on the Bids Tab
- 240320, 239353, 237660, 237212 - Delete takeoff is enabled when bid is locked
- 247000 - Auto rectangular area and Auto Count do not work when switching Mouse button for left hand use
- 186449 - Focus Redirecting Incorrectly in Bid Areas Window
- 19926 - Print Previewing or Printing Worksheet Tab cuts off the end of the Total ($) column
- 19360 - Moving multiple, touching Zones is difficult
- 183584 - Grouping by Zone on the Takeoff Tab shows "Unassigned" when using Segment Count and Slope
- 240351 - Resizing a backout makes it disappear
- 221812, 175843, - An empty zone causes performance issues when drawing takeoff
- 257909 - Maximizing the View window does not persist
- 189196 - Q2 and Q3 are not showing on Worksheet Tab when the condition has Qty 1 Result
- 260866 - Zooming in on a Typical Group Marker on a hidden Layer causes takeoff to be displayed
- 45 - Copying and Pasting takeoff and then switching back and forth between pages generates an error
- 269143 - Export Takeoff Tab to csv does not export correct quantities on Typical Groups
- 291105 - Custom tab Add/Delete buttons are out of the viewable area
Known Issues
- In the original build (02) drawing Area takeoff near the Image Window's boundaries causes the takeoff object to close or cancel rather than panning the image. As of 12/7/2016, On Center has posted an updated installer (build 15) and this issue is resolved. Build 02 is rescinded.
Digital Production Control
Features
- Allow DPC-Foreman to use Annotation Tools (must flip to Takeoff Mode first)
- Add Remaining Hours column to Budget Tab (calculated based on Estimated hours, not Earned hours)
- Add ability to multi-select Labor Cost Codes (for percenting) on tablet and touch computers
- Allow DPC Foreman and Project manager to add Notes to Budget Tab rows
Changes
- Add Labor Code Description column to Timecard LCC panel
Fixes
- Budget Graph (Budget Tab) includes Accepted Change Order data when the option to "Roll up Base Bid and Change Orders" is checked.
|
|