On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

DPC - Quick Start Guide - 04.03 Setting and Verifying Bid Area Assignment

Views: 828 Last Updated: 10/20/2021 02:58 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

checkbox Open Cover Sheet of the "Budget" project

checkbox Click Areas

checkbox Review Areas and/or create as needed

checkbox Assign all of your takeoff to the appropriate Bid Area - see the On-Screen Takeoff User Guide for instructions

Areas

checkbox Confirm you have no takeoff in "Unassigned" (check the Takeoff Tab, Grouped by Area, Collapsed)

Takeoff Tab verify that all takeoff is assigned to a Bid Area and that none remains Unassigned

previous article arrow DPC - Quick Start Guide - 04.02 Creating a Budget Copy of your Bid DPC - Quick Start Guide - 04.04 Collate Plans (drawings) next article arrow



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! Copyright 2023 - On Center Software, Inc. by ConstructConnect - All Rights Reserved.