On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Digital Production Control Quick Start Guide - 04.03 Setting and Verifying Bid Area Assignment - DPC

Views: 711 Last Updated: 07/30/2024 09:51 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

Before you send a project out to the field, you need to review it to ensure it is set up properly for use in Digital Production Control.

checkbox Open Cover Sheet of the "Budget" project

checkbox Click Areas

checkbox Review Areas and/or create as needed

checkbox Assign all of your takeoff to the appropriate Bid Area - see the On-Screen Takeoff User Guide for instructions

Areas

checkbox Confirm you have no takeoff in "Unassigned" (check the Takeoff Tab, Grouped by Area, Collapsed)

Takeoff Tab verify that all takeoff is assigned to a Bid Area and that none remains Unassigned

Next, make it easier for your Foreman or Foremen to navigate through the project plans.

click here to view the previous article DPC - Quick Start Guide - 04.02 Creating a Budget Copy of your BidDPC - Quick Start Guide - 04.04 Collate Plans (drawings) click here to view the next article



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.