DPC - Quick Start Guide - 05.05 Notes

Views: 610 Last Updated: 10/21/2021 09:12 am 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

It's important to note production variances (weather, material delays, absences, etc.) when updating your Project.  These Notes are transferred back to the Project Manager and become a historical reference for the Project.

checkbox Click on the Notes tab

checkbox Click on the Add button Add button (blue plus sign) at the bottom of the window

checkbox Enter notes

checkbox Click OK when done

DPC - how to add Notes to bid

Here you can enter job or production related notes that you want to document.  You might also include material or subcontractor issues, or conversation notes related to owners, inspectors, subs, or employees.  You should check with your project manager to determine anything else they might want entered here.  The notes are time and date stamped, and can be invaluable in the future.

previous article arrow DPC - Quick Start Guide - 05.04 Setting "Percent Complete" DPC - Quick Start Guide - 05.06 Reviewing Progress next article arrow