On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

DPC - Quick Start Guide - 03.04 Sending Project to the Field

Views: 616 Last Updated: 10/20/2021 02:16 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

checkbox Make sure you have the correct project selected (the Budget copy)

checkbox Click the Send button and select DPC Package

checkbox Select Via Project Express; please review the Related articles for instructions on registering for and using Project Express

DPC Send job via Project Express

The Create Bid Package dialog box opens

DPC - creating Bid Package for field

checkbox Select Yes to Send Images

checkbox Select Pages with Takeoff for the Range

Note
If there are pages that do not have takeoff on them but you need to include in the bid package, you can use the "Custom Pages" option for Range.  We do not recommend sending "all pages" unless the field requires them.

checkbox Click Create

Now, you will see the Project Express send dialog box.

DPC - add recipient to Send dialog box

checkbox Verify the foreman’s e-mail address (if you have corrected setup the bid with DPC Project Manager and Foreman, this should automatically be populated)

checkbox Edit the subject text to include the Project Number or a short Name and the EST Hours/Days (from the Budget Tab)

Note
Usually, the default Subject is too long and doesn't give you much information at a glance. It's best to change the subject so that the file can be immediately recognized, as we've done in the screenshot above. Including the Budgeted hours in the subject allows the foreman to verify that the bid they are accessing is updated correctly.

checkbox Click Send

When the file is successfully transmitted, you will see a confirmation dialog box.

The next time the Foreman checks his Project Express Tab, he or she will have the new job ready for download.

Warning
If this bid already exists on the Foreman's machine (if you've already sent it to the field), this DPC Bid Package will overwrite that existing bid.  Any work the Foreman has not sent back to the Project Manager will be lost.  It's critical that the Project Manager and Foremen communicate before sending/receiving updates.

previous article arrow DPC - Quick Start Guide - 03.03 Prepare Job for DPC Mode DPC - Quick Start Guide - 03.05 Receiving Updates from Field next article arrow



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! Copyright 2023 - On Center Software, Inc. by ConstructConnect - All Rights Reserved.