On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Digital Production Control Foremen Cannot See Overlay Images - DPC

Views: 4168 Last Updated: 07/30/2024 01:51 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

A Foreman (or Foremen), a user with a dpc-foreman license only, can only view the Base Image on any page. This is by design to make the program easier for the Foreman to use. The Foreman only needs to understand the actual final building plans, so there is no reason for them to see incremental changes made before work began.

If you have performed takeoff on an Overlay, you will have to swap that overlay with the base image for that page (see the On-Screen Takeoff User Guide for instructions on image/plan management).

For the Foremen to view the correct (current, latest) plan, that plan must be set as the Base Image before the Project Manager sends the DPC Bid Package to the field.



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.