On Center Home | MyOnCenter Portal | Start an On-Screen Takeoff Trial | Request a Quick Bid Demo | Contact Us | SALES: 1-866-627-6246
   
 
Learn more about Searching
Looking for help for one of ConstructConnect's Other products? Login


Tools
Table of Contents

Where are my Accepted Alternates in Digital Production Control? - DPC

Views: 448 Last Updated: 07/30/2024 01:49 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

Issue

You have Accepted Alternates in On-Screen Takeoff and Quick Bid, but don't see them when you flip a bid to "DPC Mode".

Discussion

Once a Bid is set to DPC Mode,

  • Accepted Alternates are rolled into the Base Bid and no longer separately visible while the bid is in DPC Mode. If the bid is returned to Takeoff Mode, the accepted Alternates are visible separately
  • Unaccepted Alternates are not visible in DPC Mode - they are ignored
  • Accepted Change Orders are visible in DPC Mode as separate child bids. Use the Bid View tab in the Labor Cost Codes window on the Image Tab or the Bid View drop down to switch between Base and Child Bids

Digital Production Control Bid View drop-down allows you to switch between Base Bid and Change Orders

Caution
See the Related Articles for important information about handling Change Orders when using DPC.


Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! The information in this site is protected by copyright by ConstructConnect. You may not reproduce, adapt, or publish any content from this site in whole or in part for any purpose, without the express written consent of ConstructConnect, Inc.
Copyright 2024 - All Rights Reserved.