Digital Production Control - 03.02.02 Project Manager - Collate and Organize Plans - DPC

AA-04708

To make it easier for the Foreman to percent a job efficiently, the Project Manager should rename and collate the drawings.

Open the Cover Sheet of the "Budget" project,

Update your Sheet Numberss and Sheet Names to something more Foreman-friendly by clicking on the existing name and typing in a new name. See Related Articles for more information on collating drawings.

Note
Use On-Screen Takeoff's Auto Name utility to rename a bid's Pages in just a minute or two. See Related Articles for more information.

Then use the move up click the upward pointing arrow to move a page up in the grid and move down click the downward pointing arrow to move a page down in the grid buttons to organize the plan documents the way the job will be worked. For example, on a 2 floor project with floor plans and ceiling plans, organize the plans by floor 1, ceiling 1, floor 2, ceiling 2, etc. Try to keep the job organized in a way that makes working in the project easy based on the logical progression of construction.

In the Cover Sheet adjust your Sheet Number and Names and positions to make it easier for the foreman to navigate

Rules/Restrictions

  • Each Sheet Name must be unique.
  • Each Alternate and Change Order must be uniquely named (limit names to 25 characters or less).
  • Do not use special characters. This means anything other than alpha-numeric, English (do no use anything that is a Shift+number, back slashes, forward slashes, quotation marks, question marks, etc. Letters A-Z, and numerals 0-1 and the dash/hyphen are the only characters you should use), see Related articles.

Overlays

DPC Foremen are unable to view Overlay images, this is by design.

If you have performed takeoff on an Overlay, before sending the job to the field, the Project Manager must swap the Overlay and Base images on the Cover Sheet.

Only the Base image is sent with the DPC Package.

Consult the On-Screen Takeoff User Guide (Related Articles) for assistance with Plan Organization.