QB - 09.14.05 UnAccepting an eQuote

Views: 609 Last Updated: 11/07/2022 02:13 pm 0 Rating/ Voters
Be sure to rate this article 5 Stars if you find it helpful!

After you Accept (Award) an eQuote from a Supplier, you can "unaccept" it to restore its original pricing and remove the Supplier from the Supplier column in the Materials Grid.

Unaccept an eQuote

You can Unaccept an eQuote after you've accepted it if you want to change the pricing. To Unaccept an eQuote, click the drop down arrow next to the Supplier's name, then click Unaccept eQuote.

Unaccepting an eQuote does not restore the material pricing to its former values, it only removes the Supplier information for this Bid. Click Bid > Refresh Material Pricing or accept a different Supplier's eQuote to change Material pricing. If the Master pricing was updated during eQuote acceptance the pricing would be the same and would need to be updated manually.

 Cherry Picking which Items' Pricing to Accepting (Awarding) from One or More eQuotesUpdate Master Pricing with eQuote Pricing



Product documentation (user guides) describes functionality in the latest version of each major release and may not match the functionality in the version you are using. Please check the Product Information and Downloads pages by clicking one of the product buttons above.

Something Wrong with this Article? Let us Know! Copyright 2023 - On Center Software, Inc. by ConstructConnect - All Rights Reserved.