Digital Production Control gives an estimator/project manager total job visibility to recognize labor production problems instantly. By integrating the takeoff and estimating processes, this powerful program digitally tracks labor production and payroll directly from the field to the project manager's work station in the office. Color coded plans display work in progress and indicate exactly where labor-cost overruns are occurring. Now the foreman can know immediately what production was expected to be achieved on each cost code and phase of the job. This dynamic tool lets a user know if the project is winning or losing the budget war. If the last 5% of the job is draining 50% of profits, Digital Production Control is the answer!
This is only the beginning with Digital Production Control:
Instant color coded visual feedback for job site and office management showing if the project is on, close or over projected cost budget
Sends and receives project information via the internet via wireless technology
Calculates the percent complete of a project based on the actual time card information
Capture valuable labor information for each specific activity to manage labor and maximize profit
Imports/Exports accounting information
Track and report real costs in real time
Improve future Bidding methods
Digital Production Control allows a project manager to perform job costing with greater accuracy than ever before. In addition, the project manager has real-time information at his or her fingertips. This allows the project manager to recognize problems that may slow progress and cut into profit margin. In a nutshell Digital Production Control saves a company time and money by providing the project manager with the right information at the right time.
To use Digital Production Control, the On-Screen Takeoff Bid must be set up using Price Using Quick Bid - Interactive. Digital Production Control tracks labor activity by using the Labor Cost Codes included in Conditions when priced in Quick Bid. The Labor Quantities and Hours Shown in each Conditions' Labor tab are calculated based on the Labor Activity as set in the Condition Detail item in Quick Bid.
Every contractor has a list of payroll labor cost codes. Theses codes (LCCs) will determine how accurately labor is tracked on the job site. Well defined labor codes allow more accurate tracking of job site progress against the budget. Contact your Account Manager or visit On Center Software's Web site for more information about Digital Production Control or a demonstration of this advanced labor tracking software.
The Digital Production Control User Guide is available by clicking Help > Training Center > User Guide when DPC Mode is enabled.