Digital Production Control gives you total job visibility to recognize labor production problems instantly. By integrating the takeoff and estimating processes, this powerful program digitally tracks labor production and payroll directly from the field to the project manager's work station in the office. Color coded plans display work in progress and indicate exactly where labor-cost overruns are occurring. Now the foreman can know immediately what production was expected to be achieved on each cost code and phase of the job. This dynamic tool lets you know if your project is winning or losing the budget war. If the last 5% of the job is draining 50% of your profits, Digital Production Control is your answer!
This is only the beginning with Digital Production Control:
Instant color coded visual feedback for job site and office management showing if the project is on, close or over projected cost budget
Sends and receives project information via the internet via wireless technology
Calculates the percent complete of a project based on the actual time card information
Capture valuable labor information for each specific activity to manage labor and maximize profit
Imports/Exports accounting information
Track and report real costs in real time
Improve future bidding methods
Digital Production Control allows you to perform job costing with greater accuracy than you ever thought possible. In addition, you will have real-time information at your fingertips allowing you to recognize any problems that may slow your progress and cut into your profit margin. In a nutshell Digital Production Control will save you time and save you money by providing you with the right information when you need it.
To use of Digital Production Control, your On-Screen Takeoff Bid must be set up using Price Using Quick Bid Interactive. Digital Production Control tracks labor activity by using the Labor Cost Codes you included in your Conditions when you priced them in Quick Bid. The Labor Quantities and Hours Shown on the Labor tab are calculated based on the Labor Activity as set in the Condition Detail item in Quick Bid.
Every contractor has a list of payroll labor cost codes. Theses codes (LCCs) will determine how accurately labor is tracked on the job site. Well defined labor codes will allow you to more accurately track job site progress against the budget.
The Digital Production Control User Guide is available by contacting your Account Manager or inserting the installation CD into your computer and clicking "Documentation".